{"id":8044,"date":"2026-05-26T09:02:33","date_gmt":"2026-05-26T13:02:33","guid":{"rendered":"https:\/\/www.tclp.org\/?p=8044"},"modified":"2026-05-26T09:02:35","modified_gmt":"2026-05-26T13:02:35","slug":"northbound-lane-closure-on-hall-street-fiber-manhole-work-2","status":"publish","type":"post","link":"https:\/\/www.tclp.org\/es\/news\/northbound-lane-closure-on-hall-street-fiber-manhole-work-2\/","title":{"rendered":"Cierre de carril en direcci\u00f3n norte en Hall Street, obras en la boca de acceso de fibra"},"content":{"rendered":"<p><strong>22 de mayo de 2026<\/strong><\/p>\n\n\n\n<p><strong>Contacto<\/strong>: Stephanie Tvardek, Coordinadora de Programaci\u00f3n y Operaciones, (231)-932-4565,&nbsp;<a href=\"mailto:stvardek@tclp.org\">stvardek@tclp.org<\/a><\/p>\n\n\n\n<p><strong>TRAVERSE CITY, MI <\/strong>Se informa a los residentes, negocios, automovilistas, ciclistas y peatones que Traverse City Light &amp; Power (TCLP) realizar\u00e1 trabajos de instalaci\u00f3n de fibra \u00f3ptica subterr\u00e1nea en Hall Street, entre W Front Street y Garland Street, el jueves 28 de mayo de 2026. Los trabajos se llevar\u00e1n a cabo en las alcantarillas cercanas al n\u00famero 130 de Hall Street y requerir\u00e1n el cierre temporal del carril en direcci\u00f3n norte entre las entradas norte y sur del estacionamiento del n\u00famero 130 de Hall Street, desde las 7:00 a. m. hasta aproximadamente la 1:00 p. m., si el clima lo permite, para garantizar la seguridad de los trabajadores. El tr\u00e1fico en ambos sentidos se mantendr\u00e1 utilizando el carril en direcci\u00f3n sur.<\/p>\n\n\n\n<p>Durante las obras, la parada de autob\u00fas #9175 de la Autoridad de Transporte del \u00c1rea de la Bah\u00eda (BATA), ubicada en el lado este de la calle Hall, se trasladar\u00e1 temporalmente hacia el sur, y la parada de autob\u00fas de Bayline, ubicada en el lado oeste de la calle Hall, se trasladar\u00e1 temporalmente hacia el sur del edificio del centro de transporte de BATA. Se colocar\u00e1n las se\u00f1ales pertinentes para indicar la zona de obras y los desv\u00edos, y se mantendr\u00e1 el acceso a todos los negocios en todo momento. Si es posible, utilice rutas alternativas para evitar esta zona, reducir la congesti\u00f3n, las demoras y garantizar la seguridad de los trabajadores.<\/p>\n\n\n\n<p>Agradecemos de antemano su paciencia y cooperaci\u00f3n. Si tiene alguna pregunta o inquietud sobre este trabajo, comun\u00edquese con el Coordinador de Programaci\u00f3n y Operaciones de TCLP al (231) 932-4565.&nbsp;<\/p>\n\n\n\n<p><br>###<\/p>\n\n\n\n<p><strong>Acerca de Traverse City Light &amp; Power<\/strong><\/p>\n\n\n\n<p>Traverse City Light &amp; Power (TCLP), con m\u00e1s de un siglo al servicio de la comunidad, es una empresa municipal que proporciona servicios de electricidad y telecomunicaciones a Traverse City y sus alrededores. Guiada por su misi\u00f3n de brindar servicios asequibles, confiables y sostenibles, la visi\u00f3n de TCLP es ser un socio confiable para impulsar una comunidad sostenible y conectada. Su Plan Estrat\u00e9gico se centra en seis prioridades: Enriquecimiento Comunitario, Excelencia Laboral, Experiencia del Cliente, Excelencia Operativa y Financiera, Transici\u00f3n Tecnol\u00f3gica y Sostenibilidad Ambiental.<\/p>\n\n\n\n<p>Para obtener m\u00e1s informaci\u00f3n sobre TCLP y su compromiso con la confiabilidad, visite&nbsp;<a href=\"https:\/\/nam04.safelinks.protection.outlook.com\/?url=http%3A%2F%2Fwww.tclp.org%2F&amp;data=05%7C02%7Ccommunications%40tclp.org%7C610ba711a6c34db2282008deaad5454f%7C91f3ce5cbc67437aa94020a994bcab68%7C0%7C0%7C639136030728204135%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&amp;sdata=bNTB9jUnEUw0qNp8h%2BEleXTtnjHiPCU6VObgXaA%2B4%2BE%3D&amp;reserved=0\" target=\"_blank\" rel=\"noreferrer noopener\">www.tclp.org<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>May 22, 2026 Contact: Stephanie Tvardek, Scheduling &amp; Operations Coordinator, (231)-932-4565,&nbsp;stvardek@tclp.org TRAVERSE CITY, MI \u2014 Residents, businesses, motorists, bicyclists, and pedestrians should be aware that Traverse City Light &amp; Power (TCLP) will perform underground fiber installation work on Hall Street between W Front Street and Garland Street on Thursday, May 28, 2026.&nbsp; Work will take [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5],"tags":[8],"class_list":["post-8044","post","type-post","status-publish","format-standard","hentry","category-news","tag-featured"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/posts\/8044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/comments?post=8044"}],"version-history":[{"count":1,"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/posts\/8044\/revisions"}],"predecessor-version":[{"id":8045,"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/posts\/8044\/revisions\/8045"}],"wp:attachment":[{"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/media?parent=8044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/categories?post=8044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tclp.org\/es\/wp-json\/wp\/v2\/tags?post=8044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}