Skip to main content

Power Outages: 231-922-4940

Time of Use

Commercial Demand Eco Steady

Open to any customer seeking secondary voltage service where the billing demand is 5 kW or more. This rate is not available for street lighting or for resale purposes.

The billing demand shall be the peak kilowatts (kW) supplied during the month but not less than the 5 kW.

As of December 2025, customers will be transitioned to this rate, Phase-In. If you would like to sign up for the Non-Phased-In rate, contact a customer service representative at customerservice@tclp.org or call 231-922-4940.

Rate Breakdown

PHASE-IN (OVER FOUR YEARS)
$40 per month (plus kilowatt-hour rates below)
Demand Charge: $13.28 per kW

Graph showing the rates for the Commercial Demand Eco Champion phase-in plan

NON-PHASE-IN
$40 per month (plus kilowatt-hour rates below)
Demand Charge: $4.65 per kW

Graph showing the rates for the Commercial Demand Eco Champion non-phase-in plan

Ideas to Maximize Energy Savings

thermostat icon

View your meter/hourly energy usage report. This tool can help you learn about your energy costs and usage and identify ways to save.

hot/cold icon

Shift energy-intensive activities to off-peak hours.

icon showing a pipe vent

Invest in energy-efficient equipment, such as lighting, HVAC and appliances. Learn more about TCLP’s Commercial Incentive Program.

thermostat icon

Train employees on energy-saving practices, such as turning off equipment and lights when not in use.

thermostat icon
Install and schedule programmable thermostats and occupancy sensors.
house ventilation system icon

Optimize your building performance with proper insulation, system maintenance, and making sure gaps and leaks are sealed.